A list of some of the capital improvement projects BPM has made over the past 2 years.
| DATE | Title | Description | Where |
| Fall 2006 | electrical | New 30 and 50 AMP service to A and B docks | A B docks |
| Spring 2007 | Stormwater treatment | Installed stormwater treatment basins to treat rain water runoff | Mid and far yards |
| Spring 2007 | Seawall restoration | Repaired seawall, and piles next to seawalls. Installed new railing | Mid and far yards |
| Spring 2007 | Paving | paved and striped 67K sq ft of parking area | Mid and far yards |
| Fall 2007 | New fuel dispensers | Bought new digital fuel dispensers | C dock |
| Spring 2008 | New docks | Built new dock system including new piping for fuel system, and new water system. | C and D docks and connecting docks |
| Spring 2008 | New electrical | New electrical including repair of all power pedestals, installation of new 3 phase power and all new electrical lines through docks. Installation of 100 AMP service for large transient boats | C and D docks |
| Fall 2008 | Fire Suppression system | Installed new galvanized pipes for fire suppression system | rack building |
| Fall 2008 | Wash water recycling | New state of the art closed loop washwater recycling system | Pad |
| Winter 2009 | New Mains | All new mains with new electrical and water | E, F & G |
| Summer | New Mains | All new mains with new electrical and water | A & B Docks |